Sun of our newly built home
This page is a summary of the site were examined about every day events and to build a new home when Hideyoshi. That is the source of this summary diary are still ongoing. I try to build a house, it is actively involved in from their own, called not for what a trick to good home. Do not leave do not know that you do not know. Companies do not want to leave home. But think it would because you do it properly is not a professional partner, to judge for yourself. But a matter of course.
First, if you have been left up to the housing company without knowing it, sister to discover a flaw in the drawing made just prior to this Agreement, also got in a hurry again. Exterior also, if only to convey the image, the drawing does not come up even after forever. Eventually decided to write your own picture. Unlike what you love and discipline, did not know about his past, but it quite difficult.
I wrote my experience on this site, I hope you Crelle very useful to someone.
Contract started looking up from
After marriage, I started to live the company housing. However, this is also extremely old. I have also come play here and there, I muffled moisture. Well find out now is to go around. That is why, also began their house hunting.
Found soil contamination. Go to the office to confirm the details
- Soil contamination, and then not get more obvious.
- Contact the health center
- Kyoto Prefectural Government to
Wearing options, quit
- Kitchen appliances cooking experience
- The first study
- Board decided color
- Meeting electrical drawings
Loan
- Relaxation of standards to the Corporation
- Shinsei Bank's mortgage, still awaiting review
- Shinsei Bank's mortgage, finally ending examination
- Tuesday is a contract of loan
- Run to the office
- Shinsei Bank Loan Center Osaka
Showroom Tour
- List of showrooms
- TOTO showroom
- TOSTEM showroom
- Osaka showroom NAiS
- TOEX Osaka showroom
- Hidasangyo showroom
Deficiencies in the drawings
From contract to delivery
Contract
Basis
Preceding pipe for LAN
I thought the new building and the LAN. When I lived in company housing, LAN cable to connect each room he was terribly disturbed.
From the completion of framework
- Completion of framework
- Woodwork proceeds
- Wall can have
- Bay window, heal
- Blackened
- Stairs could
- Wall
- Outer wall was painted
Interior
Exterior
- Exterior can not be determined.
- Was the first to write a painting of exterior
- Anchor for fixing the bike
- Exterior can be rapidly
- Complete exterior, without
- Anchor for the installation of bike theft prevention
From beginning to live
Delivery
- Delivery
- First of defect
- Mounted lighting
- ~ Phone has come
- Moving
- Cleaning of housing does not end
- Moving of the piano and home server
- Unit of the dryer units, installation
- Tuning of the piano
- Evaluation house
- Finally ordered a nameplate
- Replacing the switch plate
- Patrol officer contact
- Paloma PG-1000EF purchase gas stove
- Ru final return
- Try the (free) Google SketchUp
- Door phone exchange, on their own
- Desk for the purchase of PC. Glass desk.
Net relationship
- On completion B FLET application, server pinch
- Preliminary survey of construction B FLET
- Complete LAN wiring within the home
- Light opening, determined in 15 days
- B FLET, finally opening
- Server, complete moving
- But to migrate to Gigabit environment
- LAN wiring between the quality measurement of each room